§ 9-1.807. Frame and Masonry Inspection.  


Latest version.
  • Inspection of framing and masonry construction shall be made after the roof, masonry, all framing, firestopping, draftstopping and bracing are in place and after chimneys and vents to be concealed are completed and the rough electrical, plumbing, heating wires, pipes and ducts are approved.

(Ord. 3465-C.S., § 1, effective 1-3-08; Ord. 3541-C.S., § 2, effective 1-13-11)

Editor's note

Ord. 3541-C.S., § 2, effective January 13, 2011, changed the title of Section 9-1.807 from "Frame inspection" to "Frame and masonry inspection." The historical notation has been preserved for reference purposes.