§ 9-1.805. Footing and Foundation Inspection.  


Latest version.
  • Inspection of the foundation and footings shall be made after poles or piers are set or trenches or basement areas are excavated and any required forms erected and any required reinforcing steel is in place and supported prior to the placing of concrete. The foundation or footing inspection shall include excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. Materials for the foundation shall be on the job site except where concrete is ready-mixed in accordance with ASTMC94. Under this circumstance concrete is not required to be at the job site.

(Ord. 3541-C.S., § 2, effective 1-13-11)

Editor's note

Ord. 3541-C.S., § 2, effective January 13, 2011, amended Section 9-1.805 in its entirety to read as herein set out. Formerly, Section 9-1.805 pertained to concrete slab and underfloor inspection, and derived from Ord. 3465-C.S., § 1, effective January 3, 2008.