§ 9-1.611. Design Professional in Responsible Charge.
Latest version.
When it is required that documents be prepared by a registered design professional,
the Building Official shall be authorized to require the owner to engage and designate
on the building permit application a registered design professional who shall act
as the registered design professional in responsible charge. If the circumstances
require, the owner shall designate a substitute registered design professional in
responsible charge who shall perform the duties required of the original registered
design professional in responsible charge. The Building Official shall be notified
in writing by the owner if the registered design professional in responsible charge
is changed or is unable to continue to perform the duties.
The registered design professional in responsible charge shall be responsible for
reviewing and coordinating submittal documents prepared by others, including phased
submittal items, if permitted, for compatibility with the design of the building.
Where structural observation is required by Section 1709 of the California Building
Code, the statement of special inspections shall name the individual or firms who
are to perform structural observation and describe the stages of construction at which
structural observation is to occur (see also duties specified in Section 1704 of the
California Building Code).
(Ord. 3465-C.S., § 1, effective 1-3-08)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');