§ 9-11.610. Phased Approval.
The Building Official is authorized to issue a permit for the construction of any part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent requirements of this Code. The holder of such permit for the part(s) of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted.
(Ord. 3662-C.S., § 1, effective 1-6-17)