§ 9-11.1002. Temporary Connection.  


Latest version.
  • The Building Official shall have the authority to authorize the temporary connection of the building or system to the utility source of energy, fuel, or power.

    Temporary electrical or gas connection to the electrical or gas source for a period not to exceed thirty (30) calendar days may be granted prior to the final inspection if in the opinion of the Building Official the service is safe. If after thirty (30) calendar days the structure or building has not passed final inspection, the Building Official shall have authority to request the serving utility to disconnect the service.

(Ord. 3662-C.S., § 1, effective 1-6-17)