§ 7-2.37. Moratorium.
Excavation in newly renovated City streets is prohibited for three (3) years after filing of a notice of completion or acceptance of a new street or structural overlay of an entire street except as follows:
(a)
Emergency which endangers life or property;
(b)
Repair or modification to prevent denial or interruption of utility service;
(c)
Relocation work that is mandated by City, State or Federal legislation;
(d)
Service for buildings where no other reasonable means of providing service exists, as determined by the Director;
(e)
In a City street that the City has scheduled for resurfacing either during the fiscal year (July 1 - June 30) when the excavation permit is issued or during the immediately following fiscal year and the work takes place prior to the resurfacing;
(f)
For potholing to verify utility depth or location;
(g)
Horizontal Directional Drilling (HDD) excavations greater than eighteen (18) inches in depth of cover over the utility facility not requiring a significant surface incision greater than four (4) square feet and at a depth not greater than six (6) inches below the asphalt may be allowed at the discretion of the Director;
(h)
Other situations deemed by the Director to be in the best interest of the general public.
(Added by Ord. 3196-C.S., § 2, effective 2-1-01