§ 7-2.37. Moratorium.  


Latest version.
  • Excavation in newly renovated City streets is prohibited for three (3) years after filing of a notice of completion or acceptance of a new street or structural overlay of an entire street except as follows:

    (a)

    Emergency which endangers life or property;

    (b)

    Repair or modification to prevent denial or interruption of utility service;

    (c)

    Relocation work that is mandated by City, State or Federal legislation;

    (d)

    Service for buildings where no other reasonable means of providing service exists, as determined by the Director;

    (e)

    In a City street that the City has scheduled for resurfacing either during the fiscal year (July 1 - June 30) when the excavation permit is issued or during the immediately following fiscal year and the work takes place prior to the resurfacing;

    (f)

    For potholing to verify utility depth or location;

    (g)

    Horizontal Directional Drilling (HDD) excavations greater than eighteen (18) inches in depth of cover over the utility facility not requiring a significant surface incision greater than four (4) square feet and at a depth not greater than six (6) inches below the asphalt may be allowed at the discretion of the Director;

    (h)

    Other situations deemed by the Director to be in the best interest of the general public.

(Added by Ord. 3196-C.S., § 2, effective 2-1-01