  • (a)

    Whenever the City requires a design and construction of a sewer subtrunk beyond that which is required to serve a subdivision, improvement district, or area by itself, the City may provide the portion of the increased cost of constructing the sewer subtrunk directly resulting from such increased design. Said cost shall be determined by the Director in accordance with existing City policy governing reimbursement from Capital Facilities Fees, or any other source, as set forth in a resolution of the City Council.

    (b)

    Expenditures of funds by the City in accordance with the provisions of this section shall be on the basis that said expenditures will be recovered by the City from subtrunk sewer extension charges set forth in Section 5-6.803.

(Added by Ord. 3137-C.S., § 1, effective 6-17-99)