§ 5-6.802. Payment of Sewer Capacity Charges.  


Latest version.
  • (a)

    The sewer capacity charge set forth in Section 5-6.801(a) shall be paid for connection to the sewage system at the time a building permit is issued for a building or structure. In those cases where a building exists, the sewer capacity charge shall be collected at the time a plumbing permit is issued to connect said building or structure to the sewage system. The Council may, by resolutions adopted from time to time, establish conditions under which the sewer capacity charges set forth in Section 5-6.801(a) may be spread over a period of time and paid in installments.

    (b)

    The sewer capacity charge set forth in Section 5-6.801(b) shall be paid for connection to the sewage system at the time connection is made or development occurs. The Council may, by resolution adopted from time to time, establish conditions under which the sewer capacity charges set forth in Section 5-6.801(b) may be spread over a period of time, and paid in installments.

(Added by Ord. 3137-C.S., § 1, amended by Ord. 3443-C.S., § 1, effective 6-21-07)