§ 5-6.302. Connection to Sewage System—When Required.  


Latest version.
  • Every building or structure connected to a septic tank at the time a sewer lateral becomes available as defined in Section 5-6.301 shall be connected to the sewage system within five (5) years after the sewer lateral becomes available.

(Added by Ord. 3137-C.S., § 1, effective 6-17-99)