§ 5-1.516. Well Inspection Reports.  


Latest version.
  • Any inspector who has inspected any work pursuant to conditions of a permit required hereunder and which involves drilling, digging, excavating or boring a well shall, not later than thirty (30) days after completion of such work, submit to the Department an accurate and complete well inspection report on forms satisfactory to the Public Works Director. Well inspection reports shall include all of the following:

    (a)

    Permit number;

    (b)

    Type and volume of sealing material and depth of seal(s);

    (c)

    Diameter of borehole and well casing in sealing zone(s);

    (d)

    Method of placement (if grout pipe, include number and length of sections);

    (e)

    Confirmation that casing was ripped or perforated (destruction only);

    (f)

    Conditions which may have caused sealing to be less than satisfactory;

    (g)

    Date sealed;

    (h)

    An opinion as to whether the well sealing operation was satisfactory or unsatisfactory certified by signature of the registered inspector; and

    (i)

    Any other data required by the Public Works Director in the permit conditions.

(Added by Ord. 2703-C.S., § 1, amended by Ord. 3129-C.S., § 1, and Ord. 3365-C.S., § 1, effective 12-9-04)