The City Engineer may suspend or revoke a Grading and Erosion Control Permit by issuing
a notice of suspension or revocation, stating the reasons therefore, and serving same,
upon the permittee. Upon suspension or revocation of a permit, in accordance with
the provisions of this section, the permittee shall immediately cause all grading,
filling, excavating, storing, disposing or clearing and grubbing to cease until written
authorization is received from the City Engineer to proceed with the activity.
The permittee shall have twenty (20) calendar days after the date of service of the
suspension or revocation in which to file an appeal in accordance with the provisions
of Sections 1-6.501 et seq. If such an appeal is filed, the suspension or revocation shall remain in
force and be effective until a final decision on the appeal is issued by the hearing
officer.
If the City Engineer suspends a permit, such permit may either be reinstated or revoked
by the City Engineer, depending upon whether the permittee corrects the grounds stated
for the suspension in the notice issued by the City Engineer. If the permittee fails
to remedy the grounds for suspension within a time period specified by the City Engineer,
but in no event later than sixty (60) calendar days, the City Engineer shall revoke
the permit.
(Ord. 3355 § 1, effective 10-8-04)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');