§ 5-10.318. Request for Inspection.  


Latest version.
  • Requests for inspection of any site subject to the provisions of this chapter shall be made to the City Engineer at the following phases of activity. Such a request shall be made at least two (2) full business days in advance of the desired day of inspection.

    (a)

    When the site has been cleared of vegetation and unapproved fill, and scarified, benched, or otherwise prepared and before any fill is placed; and the erosion control and sediment control measures to be implemented in this phase have been placed;

    (b)

    When approximate final elevations have been established; drainage terraces, swales and other drainage devices have been graded and are ready for paving; berms have been installed at the top of slopes; and the erosion control and sediment control measures to be implemented in this phase have been placed;

    (c)

    When work has been completed; slope planting established and irrigation systems installed, if required; and the erosion control and sediment control measures to be implemented in this phase have been placed;

    The City Engineer, upon inspection of the site, shall notify the person or permittee (1) that the phase of work inspected is approved; or (2) what deficiencies, corrections or other work needs to be completed before approval of that phase.

(Ord. 3355 § 1, effective 10-8-04)