§ 4-4.606. Preliminary Soil Report.  


Latest version.
  • Prior to the submission of the final map, the subdivider shall file with the Chief Building Official a preliminary soil report, prepared by a civil engineer who is registered by the State of California, based upon adequate test borings or excavations of every subdivision for which a final map is required. The preliminary soil report may be waived if the Chief Building Official shall determine that, due to the knowledge of the Development Services Division of the Community Development Department as to soil qualities of the subdivision, no preliminary analysis is necessary.

(Ord. 836-C.S., amended by Ord. 1436-C.S., Ord. 1437-C.S., and Ord. 3128-C.S., § 4, effective 5-27-99)